Post History
Do you supply the PSON# signal before or after the main power comes on, or before connecting the load? Looking at the datasheets, the correct sequence is VAC power on, then PSON# signal to ground,...
Answer
#1: Initial revision
Do you supply the PSON# signal before or after the main power comes on, or before connecting the load? Looking at the datasheets, the correct sequence is VAC power on, then PSON# signal to ground, then DC rails come on. Your load should be connected before PSON signal is taken to ground, because this power supply doesn't support hot plugging. Before disconnecting a load, you'll need to bring PSON up again/release it from ground.